Hello team,

Over the last two days more progress was made that puts our team right on schedule. Yesterday (Wednesday, January 8th) we had our general meeting and an extended period of time after school during which to work on various elements.

The new Falcon 500 motor that we pre-ordered arrived and Software started working on testing with it. Unfortunately some firmware, update, and connectivity issues occurred but as soon as those are resolved testing should be imminent.

Build continued their work on field elements and were able to add half of the power port and half of the human player station to their list of completed tasks. They should finish up the power port and human player station soon and start work on the shield generator soon. It seems like the deadline of completion this weekend should be achievable but might need to be extended slightly.






The field elements completed so far. Still more work to be done but good progress overall.

Design had a major milestone complete yesterday as well. After a couple of days of geometry testing of three different robot profiles, the design team voted on a specific profile to pursue. Over the next two and a half weeks they will be designing components and passing it on to build for construction.




A rough geometric sketch of the design. This should serve as a estimate of what the robot would look like.

Overall, things seem to be on track and according to schedule so far. This has been a chaotic yet overall successful start to the build season and if things keep on rolling like this, we should be in for a well-oiled season.

Comments

Popular posts from this blog

New and Improved!

Hello and welcome to the new blog for Team 2658: Σ-Motion! If you are new, this is the sanctum where our officers share some of the successes, failures, and lessons learned from ongoing projects and events. The blog originated from Toshko Andreev, a 2658 alumni and ex-president. He gifted us the blog posts for the 2020 and 2021 seasons on another platform (We are switching to blogger for more exciting features!). Now, we would like to share some of the progress on things that we have been working on.  Following our many successes from the 2021 season , the team has been hard at work in preparation for the approaching 2022 season. Due to the unfortunate circumstances during the season this year, the team has jumped to the idea of building our award-winning robot (Whirlpool) this summer/fall to help develop our hands-on skills. Whirlpool Breakdown From the use of our bandsaw and drill press to the use of our mill and CNC router, members of the build team are getting parts done on a...

January 26

As we enter the second week, we have been designing the main structure of this year’s robot. Working over the week and going into the weekend, we’ve made many sketches and calculations along with dimensioning and optimizing the alignment of mechanisms. Starting from the base up, we have the drivetrain. This year we have decided to use a Tank Drive because this fast pace game challenges us to have speed in our driving rather than accuracy. We saw many advantages to a Tank Drive than a Swerve drive in that testing a swerve drive would be very risky for our software team. We have never used a Swerve Drive for our robots before, although arguably useful, the better alternative is the Tank Drive. Additionally, our drivers are already familiar with the controls that accompany it. This simple design allows us to maximize the spacing on a 29.5x29.5 square inch drivetrain and reduces the spacing issue we’ve had in the past between mechanisms and electrical designing.         ...

January 9/10

Day two of the season went by in the blink of an eye. Great discussions were made, and our priority list started to finalize. Finishing off day two and starting day three, here’s a recap of what happened. Our build team worked hard to finish most of the practice field. The Hangar Zone has practically been completed, but some minor adjustments for the Low Rung still need to be made. As we continue to vigorously work, we will hopefully see the whole Hub and Terminal Area finished in the next couple of days. Thanks again to build for getting our practice field done. Now, we can better visualize as we begin prototyping.                 With our priority list finalized after day two, our team has done much research and looked into shooting in the Lower Hub this season. Having to understand that point values are very valuable this season, we think that there is much value in having a fast cycle time, so targeting the Lower Hub would best meet our needs....